Week 1
Objective
Background Research
Individual Tasks
Becky
- ECG and set up iGEM wiki page
Calista
- Cardiorespiratory monitors (features, functions and relationship with patient state)
Choi Wan
- Physiological Systems
Eva
- Heart rate variability (HRV) and slide template/design
Tara
- Cardiorespiratory monitoring (who, what, where, why and how)
Presentation
Week 2
Objective
Research on currently available cardiorespiratory monitors and compare them
Individual tasks (companies to research on)
Becky
- Omron and Getinge
Calista
- Abbott, GE Healthcare and Medtronic
Choi Wan
- Hill-Rom, Philips Healthcare and Boston Scientific
Eva
- W.L.Gore & Associates and Lepu Medical Technology
Tara
- Terumo and Edwards Lifesciences
Presentation
Media:HRV_CardioMonitors_2.pdf
Weeks 3-4
Objectives
- Research into more specific aspects of cardiorespiratory monitors and compare them
- Research from the perspective of clinicians
Individual Tasks
Becky
- Home base of companies
- Target users for each device
- User interface for patients and HCP
- Color code standard of alerts, interface, etc.
- FDA and CE Mark classification, minimum requirements, testing criteria and approval
Calista
- Cardiorespiratory parameters used for monitoring in the ITU and in relation to Covid
- Real-life examples of cardiorespiratory monitoring in healthy and ill individuals
- Siemens and their devices/technology
- Strengths and weaknesses of each device (comparison)
- Exercise monitoring (Omron, Apple Watch, Samsung) compared to clinical monitoring (accuracy standard)
- Collaboration between clinicians and designers for product design
Choi Wan
- Relationship and dependence between different parameters
- Viewing mode of parameters in different devices (as graphs or values)
- Criteria, differences between home monitoring or ICU monitoring
- Market size and share of each major company
- Invasive/non-invasive monitoring
- Electronic patient records and their integration into hospitals/clinics
Tara
- Cardiovascular conditions which are important to clinicians in the ICU
- Perspective of clinician in selecting cardiorespiratory monitors
- Minimal requirements of cardiorespiratory monitors in the ICU
- Alarm systems in cardiorespiratory monitors
Eva
- Off due to personal circumstances.
Presentation- Weeks 3&4
Media: HRV Clinician POV 3.pdf
Week 5
Objectives
- Focus in on a few clinical conditions (COPD, heart attacks and sepsis)
- What parameters are monitored and the clinical care pathways in hospitals for these conditions
Individual Tasks
Becky
- Heart attack
Calista
- COPD
- Covid-19
Choi Wan
- Sepsis
Eva
- Sepsis
Tara
- COPD
Presentation
Media: HRV_Conditions_in_ICU.pdf
Weeks 6-7
Objectives
- Organise research into a clear structure on the Wiki
- Integrate and connect the concepts and information gathered from previous weeks
- Look at care pathways and case studies from journals
Individual Tasks
Update each section of the wiki with research from individual reports
Weeks 8-12
Objectives
- Write individual reports and group planning report, first draft due by 28 Dec
Individual tasks
Becky
- Report topic: Challenges of monitoring in the ICU
- Group report section: Background, Preliminary Findings
Calista
- Report topic: ECG
- Group report section: Background, implementation plan/Gantt Chart
Choi Wan
- Report topic: Sepsis
- Group report section: Introduction, Background
Eva
- Report topic: HRV
- Group report section: Background, Conclusion
Tara
- Report topic: COPD
- Group report section: Backgorund, Risk assessment
Autumn Term Task Allocation

Week 13
Objectives
- Signal processing methodologies/code
- Find ECG datasets to analyse
- Continue documenting on new findings
Tasks
- Learn basic python and github to code collaboratively
- Search for clean ECG data (not waveforms) to open using code
- Update the wiki with new findings
Week 14
Objectives
- SWOT analysis on HRV calculation methods
- Signal Processing of ECGs (e.g. Finding RR peaks)
Tasks
- Read papers on HRV analysis in different domains and compare them
- Learn more about pandas for ECG signal processing and using stream for large datasets
- Study and understand (existing) code(s) for HRV analysis
- Note the sampling rate for each dataset and extract 15-20 beats for processing
Presentation
Media:Different_methods_to_extract_HRV.pdf
Week 15
Objectives
- Signal Processing of ECGs
- Pipeline of HRV derivation from ECGs
- HRV in a clinical setting
Individual Tasks
Becky
- Reading ECG from .dat files
- Plotting ECGs
- Summarise and create a flowchart of different ECG signal processing steps
Calista
- Filtering and removing baseline drift from ECGs (preprocessing)
Choi Wan
- Reading ECG from .dat files
- Derivative approach
Eva
- Contacting clinicians to conduct interview/survey on the use of HRV in clinical settings
- Read papers on HRV analysis
Tara
- Finding R peaks from ECG
Presentation
Week 16
Objectives
- Create a general code which can process ECGs in a standardised manner (e.g. use the same sampling frequency, interpolation, etc.)
- R peak detection code
- Utilising different filters for preprocessing of ECGs
Individual Tasks
Becky
- Create artificial ECG/add noise to create new samples for testing
- Create a diagram to outline all the steps involved in signal processing
Calista
- Apply different filters to ECG
- Test filters with noisier data
Choi Wan
- Develop original R peak detection code instead of using available python modules
Eva
- Continue looking at papers about HRV from a clincian's perspective
- Follow-up on clinicians about questions/survey
- Look at what the different bands in the power spectral density graph mean how the power spectral density relates to actual long-term conditions
Tara
- Resample the function at 1000Hz
- Look at how smooth interpolation function works
Presentation
The following contains feedback and results from a survey of healthcare professionals including doctors and nurses and an interview with a general practitioner. Media: ClinicianSurveyResults.pdf
Week 17
Objectives
- Develop signal processing code of ECGs
- Pipeline of HRV derivation from ECGs
- Research more into HRV in a clinical setting
Individual Tasks
Becky
- Reading ECG from .dat files
- Plotting ECGs
- Summarise and create a flowchart of different ECG signal processing steps
Calista
- Filtering and removing baseline drift from ECGs (preprocessing)
Choi Wan
- Reading ECG from .dat files
- Derivative approach for peak detection
Eva
- Contacting clinicians to conduct interview/survey on the use of HRV in clinical settings
- Read papers on HRV analysis
Tara
- Finding R peaks from ECG
Week 18
Objectives
- Create a general code which can process ECGs in a standardised manner (e.g. use the same sampling frequency, interpolation, etc.)
- R peak detection code
- Utilising different filters for preprocessing of ECGs
Tasks
Becky
- Create artificial ECG with baseline drift and 50Hz noise
- Add noise to normal sinus rhythm ECG to create new samples for testing
Calista
- Research types of noise commonly found in ECGs
- Apply different filters to ECG for denoising
Choi Wan
- R peak detection using derivative approach
Eva
- Continue looking at papers about HRV from a clinician's perspective
- Follow-up on clinicians about questions/survey
- Look at what the different bands in the power spectral density graph mean how the power spectral density relates to actual long-term conditions
Tara
- Resample the function at 1000Hz
- Look at how smooth interpolation function works
Week 19
Objectives
- Organise code, put different sections of code together
- Presentation on clinician survey results
- Start group report
Individual Tasks
Becky
- Combine all sections of code into main python script
- Organise git repo
Calista
- Improve filtering
- Organise git repo
Choi Wan
- Improve R peak detection
- Organise git repo
Eva
- Summarise and present data from survey
- Find out more about Kubios (leading HRV analysis software in the market)
Tara
- Improve pre-processing
- Make a rough outline of group report
Week 20
Objectives
- Standardising plots (axes, labels, units, etc.) for displaying results
- Run the code on ECGs of different conditions and artificial ECG
- Group report
Individual Tasks
Becky
- Standardise plot function in main script
- Test code with artificial ECG
- Writing first draft of group report
- Organise git repo
Calista
- Fix errors with filter
- Writing first draft of group report
- Organise git repo
Choi Wan
- Plot RR intervals on a single graph
- Writing first draft of group report
- Organise git repo
Eva
- In-depth analysis and graphs of survey results
- Present data from GP survey
- Writing first draft of group report
Tara
- Organise git repo
- Writing first draft of group report
Week 21
Objectives
- Fine-tuning code
- Finalise group report for submission
Tasks
- Edit group report draft based on feedback
- Add all data to appendices and make it neat
- Fix references
Spring Term Task Allocation
| Group Member | Responsibilities |
|---|---|
| Tarane Subramaniam | |
| Eva Tadros | |
| Rebecca Vickery | |
| Calista Yapeter | |
| Choi Wan Yip |
Tasks shared among all members:
- Researching and comparing cardiorespiratory monitors from different companies
- Researching the extraction of HRV in different domains
Weeks 22 - 30
Easter Break and Final Exams
Week 31
Objectives
- Review feedback from group report
- Poster design and content
Individual Tasks
Becky
- Methodology section of poster
Calista
- Conclusion section of poster
Choi Wan
- Results section of poster
Eva
- Individual presentation
Tara
- Introduction section of poster
Week 32
Objectives
Poster presentation