IGEM:IMPERIAL/2007/Calendar/2007-9-3
From OpenWetWare
Jump to navigationJump to search
We are in Week 9 of the iGEM project
Project Calendar
<calendar> name=IGEM:IMPERIAL/2007/Calendar date = 2007/08/01 view=threemonths format=%name/%year-%month-%day weekstart=7 </calendar>
Debrief
Testing of DNA constructs
- Raw results up on the wiki
- Refinfed data and graphs currently being put up
- Data to be given to modelling team for analysis
- Problems with staggering of experiments - results not very useful
- Talk to supervisors
- Try to get longer access to equipment (fluorometer, incubator etc)
- Find out methods to reduce error and variability in results
Cloning
- pTet and pLux constructs have been cloned
- > 300µg of each DNA made - enough for all experiments
- LuxR arrived - might be transformed by Wed
- Protocol team to talk to clonning team about details
- pT7-GFP construct being cloned in BL21
Vesicles
- New procedure being adapted which works well- not leaving overnight and using 10ml suspension
- Saves ingredients
- No need to leave overnight
- Cell extract will be tested in vesicles tomorrow
- FACS machine for counting vesicles - not sure if can get access
- No concrete decision yet made on where vesicles fit into the project
- Meeting between Dirk (captain vesicles), Ben (captain ID) and Alex (captain CBD) to discuss feasibility of vesicles
Wiki
- In the process of being redesigned - Alex and Anthony
- Make wiki more organise and facilitate navigation for visitors
- Talked to Vincent
- Talking to individual groups about sections relevant to them and proposed layout
AOB
- Characterisation of chassis - need to focus on it a bit more
- Modelling and testing within in-vitro and vesicles
- Use literature rather than experiments to characterise chassis being used
- Use the information in in-veso teams(old oraganisation) page