-
Boston Sand and Gravel's finest
-
Excavating for the curtain wall, April 3, 2008
-
Construction site: April 10, 2008
-
Pouring the pilings
-
Construction site: April 25, 2008
-
Large crane
-
Pile driving
-
Drainage pipes
-
Pile driving, April 30, 2008
-
Still life with pipes and barrels
-
The Guys