Klapperich Lab:Notebook/Lab Meeting Notes/2008/11/04: Difference between revisions
From OpenWetWare
Jump to navigationJump to search
Line 42: | Line 42: | ||
<br> | <br> | ||
† Biointerfaces group <br> | † Biointerfaces group <br> | ||
* | * Mask writer's calibration was done. <br> | ||
* | * Paul Mak told that Mask aligner at Photonics center has UV filter. Try that machine.<br> | ||
* Preliminary E. coli experiment is ongoing. <br) | |||
* Try DAPI bacteria stain to visualize e-coli soon. <br> | |||
<br> | <br> | ||
† CIMIT- Colson Grant<br> | † CIMIT- Colson Grant<br> | ||
Line 54: | Line 56: | ||
'''* Fixuture for PCR chip. The heater and the thermocouples would be on the fixture. <br>''' | '''* Fixuture for PCR chip. The heater and the thermocouples would be on the fixture. <br>''' | ||
* Qingqing has to do experiments with MinCheol's designs. AS SOON AS CLEANING CONTEROLS ARE IN PLACE. <br> | * Qingqing has to do experiments with MinCheol's designs. AS SOON AS CLEANING CONTEROLS ARE IN PLACE. <br> | ||
* Mincheol will work on DNA migration simulation after IMECE 2008. | |||
<br> | <br> | ||
† RCA <br> | † RCA <br> |
Revision as of 20:10, 3 November 2008
Project name | <html><img src="/images/9/94/Report.png" border="0" /></html> Main project page <html><img src="/images/c/c3/Resultset_previous.png" border="0" /></html>Previous entry<html> </html>Next entry<html><img src="/images/5/5c/Resultset_next.png" border="0" /></html> |
4 November 2008 Lab Meeting Agenda† Mark's research report today. † Announcements
† COBRA
* Fixuture for PCR chip. The heater and the thermocouples would be on the fixture.
|