Difference between revisions of "Haynes:TechResources"

From OpenWetWare
Jump to: navigation, search
(Shared Equipment)
(Shared Equipment)
Line 32: Line 32:
 
'''Lucille: Light Cycler 480'''<br>
 
'''Lucille: Light Cycler 480'''<br>
 
Update: The lab will be purchasing a permanent unit this year. Expected arrival is December '11/ January '12. In the mean time, a demo unit will be available for use.
 
Update: The lab will be purchasing a permanent unit this year. Expected arrival is December '11/ January '12. In the mean time, a demo unit will be available for use.
* [http://www.google.com/calendar/embed?src=asu.edu_7s7m81pvth8183tnlnmim9a7io%40group.calendar.google.com&ctz=America/Phoenix Sign-Up Calendar]: It is '''mandatory''' that you sign up before using the Light Cycler 480. E-mail [[User:Karmella Haynes|Karmella Haynes]] to gain access to the calendar.
+
* [http://www.google.com/calendar/embed?src=asu.edu_7s7m81pvth8183tnlnmim9a7io%40group.calendar.google.com&ctz=America/Phoenix Sign-up calendar]: It is '''mandatory''' that you sign up before using the Light Cycler 480. E-mail [[User:Karmella Haynes|Karmella Haynes]] to gain access to the Google calendar.
 
* [http://www.roche-applied-science.com/sis/rtpcr/htc/index.jsp?&id=htc_060000 User technical information]
 
* [http://www.roche-applied-science.com/sis/rtpcr/htc/index.jsp?&id=htc_060000 User technical information]
 
* [http://www.roche-applied-science.com/sis/rtpcr/htc/index.jsp?id=htc_070400 Software downloads]
 
* [http://www.roche-applied-science.com/sis/rtpcr/htc/index.jsp?id=htc_070400 Software downloads]

Revision as of 11:25, 21 November 2011


Technical Resources

BioBrick Collections


Chemicals

  • Chemical Inventory Spreadsheet: This Google Docs spreadsheet lists all of the chemicals in the Haynes Lab inventory, plus safety precautions and links to the Material Safety Data Sheets (MSDS).


Shared Equipment

Burrrt: -150°C Cryogenic Freezer
Update: Burrrt is currently offline. He will be up and running after out move to ISTB4 in Spring 2012.


Lucille: Light Cycler 480
Update: The lab will be purchasing a permanent unit this year. Expected arrival is December '11/ January '12. In the mean time, a demo unit will be available for use.