This page is for keeping track of what is going on with the design and construction of the new "Endolke / Smendy" labs at Stanford.

  1. Is all project funding in place? Yes (confirmed as of 4/23).
  2. Schedule 50% design review w/ Brian (confirmed for 9a June 2 at Stanford)
    1. First 2 hours are to go through shop drawings (DE and CDS should study existing plans before meeting)
      • Equipment placement and so on, not cabinetry
    2. Second 1-2 hours is to work with Claire on lighting, color, and offices

What are the next steps?

  1. Attend June 2 design meeting (All)
  2. Confirm location and funding of admin. office in Y2E2-254 (Raul)
  3. Inspect and select layout for CDS and DE offices (CDS, DE)

Plans:
PDF of lab plans, v17
AVI of lab plans, v17

Schedule (as of April 30):
Design, Permitting, Construction