User:Pranav Rathi/Notebook/OT/2010/04/29

From OpenWetWare

(Difference between revisions)
Jump to: navigation, search
(Entry title)
Line 12: Line 12:
* We will also try to complete TCA setup.
* We will also try to complete TCA setup.
*Next week Anthony is not here, so I am planning to do beam profiling again at lower temperature, sum signal experiment and power calibration and may be some unzipping ;->
*Next week Anthony is not here, so I am planning to do beam profiling again at lower temperature, sum signal experiment and power calibration and may be some unzipping ;->
 +
[[Category:Optical Tweezer]]

Revision as of 17:53, 5 May 2010

Project name Main project page
Previous entry      Next entry

Optical tweezer

  • I am glad to say this; that our tweezer is almost ready to use. Thanks to Andy (for his tremendous job in designing the set-ups and his very valuable advice) and Anthony (tremendously help me with the set-up and TCA set-up with power-supply is POA; piece of art.
  • He-Ne made our alignment so easy that now even a Cave-Man can do it, he can just focus on the He-Ne reflection in the microscope and that is it: IR is sitting right on the top of it.
  • A part of steering assembly and collimation is left which we will fix tomorrow.
  • We will also try to complete TCA setup.
  • Next week Anthony is not here, so I am planning to do beam profiling again at lower temperature, sum signal experiment and power calibration and may be some unzipping ;->
Personal tools