User:Pranav Rathi/Notebook/OT/2010/04/29

From OpenWetWare

< User:Pranav Rathi | Notebook | OT | 2010 | 04(Difference between revisions)
Jump to: navigation, search
Current revision (16:23, 15 November 2012) (view source)
 
Line 12: Line 12:
* We will also try to complete TCA setup.
* We will also try to complete TCA setup.
*Next week Anthony is not here, so I am planning to do beam profiling again at lower temperature, sum signal experiment and power calibration and may be some unzipping ;->
*Next week Anthony is not here, so I am planning to do beam profiling again at lower temperature, sum signal experiment and power calibration and may be some unzipping ;->
-
[[Category:Optical Tweezer]]
+
[[Category:Optical tweezers Notes Archive]]

Current revision

Project name Main project page
Previous entry      Next entry

Optical tweezer

  • I am glad to say this; that our tweezer is almost ready to use. Thanks to Andy (for his tremendous job in designing the set-ups and his very valuable advice) and Anthony (tremendously help me with the set-up and TCA set-up with power-supply is POA; piece of art.
  • He-Ne made our alignment so easy that now even a Cave-Man can do it, he can just focus on the He-Ne reflection in the microscope and that is it: IR is sitting right on the top of it.
  • A part of steering assembly and collimation is left which we will fix tomorrow.
  • We will also try to complete TCA setup.
  • Next week Anthony is not here, so I am planning to do beam profiling again at lower temperature, sum signal experiment and power calibration and may be some unzipping ;->
Personal tools