User:Moira M. Esson/Notebook/CHEM-581/2012/11/07

From OpenWetWare

Jump to: navigation, search
Project name Main project page
Previous entry      Next entry

Objectives

  1. Finish running FTIR on remaining films.
  2. Finish running UV-vis on porphyrin and sulfate salt solutions(must reprepare various concentrations)

FTIR

  • The general protocol for FTIR was followed

Films ran FTIR on:

  1. PVOH(22K) 1.0067g+1mL GA+1mL porphyrin crosslinked
  2. PVOH(22K)+0.5mL GA+0.104g NaMT crosslinked spun 10 min CuSO4 prepared 10/17/2012
  3. PVOH(22K)+0.5mLGA+0.99mL porphyrin(no color on film )crosslinked prepared 10/19/2012
  4. PVOH(22K)+1mL GA+100%CEC crosslinked prepared 10/4/2012
  5. PVOH(22K)+1mL GA+1mL porphyrin crosslinked prepared 10/24/2012
  6. PVOH(22K)+0.5mL GA+1mL porphyrin crosslinked prepared 10/24/2012 #2
  7. PVOH(22K)+0.5mLGA+1mL porphyrin prepared crosslinked 10/26/2012
  8. PVOH(22K)+0.8wt% GA+100%CEC crosslinked spun 10 min CuSO4 prepared 10/26/2012
  9. PVOH(22K)+0.8wt% GA+50% CEC crosslinked spun 10 min CuSO4 prepared 10/17/2012

UV-vis

Image:Al2(SO4)3.jpg

Image:Fe2(SO4)3.jpg

Image:FeSO4.jpg

Image:Na2SO4.jpg



Personal tools