User:Linh N Le/Notebook/2009/08/17: Difference between revisions
From OpenWetWare
Line 17: | Line 17: | ||
**Koch also wants the cables to be ~2ft long | **Koch also wants the cables to be ~2ft long | ||
*There may also be a problem with strain relief, so we should find a way to connect all 4 of the connections that Koch wants me to setup | *There may also be a problem with strain relief, so we should find a way to connect all 4 of the connections that Koch wants me to setup | ||
*I have 4 cables attached to the module with BNC heads on one end and wired to AI0, AI1, AI2, AI3, and grounds repectively | |||
*The setup will be sitting near my work area (gel area of wetlab) | |||
<!-- ##### DO NOT edit below this line unless you know what you are doing. ##### --> | <!-- ##### DO NOT edit below this line unless you know what you are doing. ##### --> | ||
|} | |} |
Revision as of 16:55, 17 August 2009
Project name | <html><img src="/images/9/94/Report.png" border="0" /></html> Main project page <html><img src="/images/c/c3/Resultset_previous.png" border="0" /></html>Previous entry<html> </html>Next entry<html><img src="/images/5/5c/Resultset_next.png" border="0" /></html> |
To Do
DAQ Card
|