User:Linh N Le/Notebook/2009/06/30: Difference between revisions
From OpenWetWare
(→OT) |
|||
Line 27: | Line 27: | ||
*We need to visit Dr Osinski's spectrophotometer to get some calibration data on the phorphoric content of our samples | *We need to visit Dr Osinski's spectrophotometer to get some calibration data on the phorphoric content of our samples | ||
**For that we will need the square tubes that go in the meter and possibly well plates (of which i do not know if we have) | **For that we will need the square tubes that go in the meter and possibly well plates (of which i do not know if we have) | ||
==Russ and Microscope parts== | |||
*Russ came in while the rest of the lab was heading to the group meeting at panda | |||
*Russ told me that 95% of the things that Dr Koch ordered have come in | |||
*so far (as what i can remember him telling me)... | |||
**10x objective (not lead free) | |||
**2 non-focusing eye pieces (focusing one is "supposedly" in minnesota and will be shipped over if its there) | |||
* New cube turret | |||
* large trinocs' | |||
<!-- ##### DO NOT edit below this line unless you know what you are doing. ##### --> | <!-- ##### DO NOT edit below this line unless you know what you are doing. ##### --> | ||
|} | |} |
Revision as of 14:05, 30 June 2009
Project name | <html><img src="/images/9/94/Report.png" border="0" /></html> Main project page <html><img src="/images/c/c3/Resultset_previous.png" border="0" /></html>Previous entry<html> </html>Next entry<html><img src="/images/5/5c/Resultset_next.png" border="0" /></html> |
To Do
11-6 OT
Kinesin
Russ and Microscope parts
|