User:Karmella Haynes/Notebook/PcTF Genomics/2014/11/16: Difference between revisions

From OpenWetWare
Jump to navigationJump to search
(Autocreate 2014/11/16 Entry for User:Karmella_Haynes/Notebook/PcTF_Genomics)
 
Line 8: Line 8:




==mm/dd/yy==
==11/16/14==
<!-- Precede finished items with a checkmark &#x2713; -->
<!-- Precede finished items with a checkmark &#x2713; -->
* Line item 1
* Transfection: Re-plate transfected cells
 


----
----
'''Line item 1'''<br>
'''Transfection: Re-plate transfected cells'''<br>
> Samples
* KAH126/MV2 cells in well 1 were ~50% - 16% RFP+ (very high!)
 
** Could be due to low passage number (these were passage-1 cells)
{| class="wikitable" border="0" cellspacing="3" <!-- Rxn. table -->
* Re-plated cells into two plates (U2OS complete growth medium):
|-valign="top"
** 96-well: 0.2 mL per well (~5.2 E3 cells/well)
| <u>Reagent</u> || <u>Volume</u>
** 24-well: 2.0 mL per well (~21.0 E3 cells/well)
|-
* Tomorrow (Monday), check wells for RFP signal; if confluent re-plate high RFP samples (or wait until Tuesday)
| reagent 1 || # μL
|-
| reagent 2 || #
|-
| reagent 3 || #
|-
| reagent 4 || #
|-
| dH<sub>2</sub>O || #
|-
| &nbsp; || # μL
|}
 
--> Reaction conditions





Revision as of 12:53, 17 November 2014

Pc-TF Genomics <html><img src="/images/9/94/Report.png" border="0" /></html> Main project page
<html><img src="/images/c/c3/Resultset_previous.png" border="0" /></html>Previous entry<html>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</html>Next entry<html><img src="/images/5/5c/Resultset_next.png" border="0" /></html>


11/16/14

  • Transfection: Re-plate transfected cells



Transfection: Re-plate transfected cells

  • KAH126/MV2 cells in well 1 were ~50% - 16% RFP+ (very high!)
    • Could be due to low passage number (these were passage-1 cells)
  • Re-plated cells into two plates (U2OS complete growth medium):
    • 96-well: 0.2 mL per well (~5.2 E3 cells/well)
    • 24-well: 2.0 mL per well (~21.0 E3 cells/well)
  • Tomorrow (Monday), check wells for RFP signal; if confluent re-plate high RFP samples (or wait until Tuesday)