Talk:20.109(S14): Choose system conditions and paper discussion (Day3): Difference between revisions
From OpenWetWare
Jump to navigationJump to search
No edit summary |
No edit summary |
||
Line 23: | Line 23: | ||
|- | |- | ||
| Hybrid: sticky upstream, blunt downstream | | Hybrid: sticky upstream, blunt downstream | ||
| | |Pink Team (TR) | ||
| | | | ||
| | | |
Revision as of 13:40, 18 March 2014
Please include both your section and your team color in one slot below. Across the class, be sure that each topology is tested by at least two groups.
Cut topology | Group 1 | Group 2 | (Group 3) |
---|---|---|---|
Sticky ends, 5' overhangs | Orange Team (TR) | ||
Sticky ends, 3' overhangs | |||
Blunt | |||
Hybrid: sticky upstream, blunt downstream | Pink Team (TR) | ||
Hybrid: blunt upstream, sticky downstream | |||
Sticky ends with sequence mismatch | Green Team (TR) | ||
Sticky ends with sequence and topology mismatch |