Talk:20.109(S14): Choose system conditions and paper discussion (Day3): Difference between revisions

From OpenWetWare
Jump to navigationJump to search
No edit summary
No edit summary
 
(One intermediate revision by one other user not shown)
Line 29: Line 29:
| Hybrid: 3' sticky upstream, blunt downstream  
| Hybrid: 3' sticky upstream, blunt downstream  
|Red Team (TR)
|Red Team (TR)
|
|Pink Team (WF)
|
|
|-
|-
Line 38: Line 38:
|-
|-
| Sticky ends with sequence and topology mismatch
| Sticky ends with sequence and topology mismatch
|
|BA Orange Team (WF)
|
|not so BA Silver Team (WF)
|
|
|-
|-
|}
|}

Latest revision as of 13:33, 19 March 2014

Please include both your section and your team color in one slot below. Across the class, be sure that each topology is tested by at least two groups.

Cut topology Group 1 Group 2 (Group 3)
Sticky ends, 5' overhangs Orange Team (TR) Red Team (WF)
Sticky ends, 3' overhangs Blue Team (TR) Purple Team (WF)
Blunt Yellow Team (TR) Yellow Team (WF) Blue Team (WF)
Hybrid: 5' sticky upstream, blunt downstream Pink Team (TR) Green Team (WF)
Hybrid: 3' sticky upstream, blunt downstream Red Team (TR) Pink Team (WF)
Sticky ends with sequence mismatch Green Team (TR) White Team (WF)
Sticky ends with sequence and topology mismatch BA Orange Team (WF) not so BA Silver Team (WF)