Smolke:Spring cleaning

From OpenWetWare
Jump to navigationJump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Home        Contact        Internal        Protocols        Lab Members        Publications        Research       


When

Friday May 25 (8 am - noon):

  • Can't make it: PDJ, Jay
  • Can make it: Kathy, Josh, Ryan, Joe, Eric, Kate, Yen-Hsiang (till 11a), Steph, Mike, Andy, DK, remus, Isis, Melina

Alternative time(s):

  • Monday Jun 4 (8 am - noon)?
    • Can't make it: Josh, Kate, Yen-Hsiang, Jay
    • Can make it: Kathy, Ryan, Joe, Eric, PDJ, Steph (after 9), Andy, DK, remus, Isis, Melina

What

  • -80oC backup (make space for new E. coli backup rack)
  • Cold room (remove old plates, make sure all plates are organized, general organization, cleaning)
  • Deli fridge and individual 4C
  • Quanta area (and associated cabinet)
  • LC-MS area
  • Gel station (and shelves/drawers)
  • -20 freezer
    • including freezer door
    • main -20, specially all the chemicals that should be stored in air-tight containers (dessicators) but now exposed
    • clear out alumni boxes
  • Sinks (and all the random stuffs on the peg)
  • Both rocking platforms (growing the wrong kind of fungus)
  • Benchtop centrifuges (inside)
  • Floor centrifuge
  • Incubators (standing and shaking)
  • Hoods
  • Food fridges/microwave/dish racks
  • Protocols/user names on Dyad PCR block
  • Protocols, users, and data on Quanta computer
  • Water baths
  • TC room water bath
  • Thin out old tip boxes?
  • Radioactive station/freezer
  • Balances / pH meter area
  • stuff on top of the plate shaker
  • wipe down benches and shelves
  • get rid of any excess stuff that is not needed on benches and shelves
  • sort out pipettes and recover unused pipette sets from people leaving