When
Thursday July 3 (8 am - noon or finished):
What
- -80oC backup (make space for new E. coli backup rack)
- Cold room (remove old plates, make sure all plates are organized, general organization, cleaning)
- Deli fridge and individual 4C
- Quanta area (and associated cabinet)
- LC-MS area
- Gel station (and shelves/drawers)
- -20 freezer
- including freezer door
- main -20, specially all the chemicals that should be stored in air-tight containers (dessicators) but now exposed
- clear out alumni boxes
- Sinks (and all the random stuffs on the peg)
- Both rocking platforms (growing the wrong kind of fungus)
- Benchtop centrifuges (inside)
- Floor centrifuge
- Incubators (standing and shaking)
- Hoods
- Food fridges/microwave/dish racks
- Protocols/user names on Dyad PCR block
- Protocols, users, and data on Quanta computer
- Water baths
- TC room water bath
- Thin out old tip boxes?
- Radioactive station/freezer
- Balances / pH meter area
- stuff on top of the plate shaker
- wipe down benches and shelves
- get rid of any excess stuff that is not needed on benches and shelves
- sort out pipettes and recover unused pipette sets from people leaving
|