Physics307L:Schedule/Week 10 agenda: Difference between revisions

From OpenWetWare
Jump to navigationJump to search
No edit summary
No edit summary
Line 5: Line 5:
==Pushing rough draft due date back one week==
==Pushing rough draft due date back one week==


==Fitting a line (linear regression, least-squares fit for a line)==
==(Topic already covered, need new topic) Fitting a line (linear regression, least-squares fit for a line)==
===[[/Why linear fit|Why and when linear fit?]]===
===[[/Why linear fit|Why and when linear fit?]]===
===[[/Linear fit theory|Theoretical background]]===
===[[/Linear fit theory|Theoretical background]]===

Revision as of 20:54, 23 October 2008


Talk about lab improvisation (Darrell)

Pushing rough draft due date back one week

(Topic already covered, need new topic) Fitting a line (linear regression, least-squares fit for a line)

Why and when linear fit?

Theoretical background

Practical examples (We did this last week)

Fitting y = mx + b versus x = m'y + b'

More sophisticated curve fitting...a must read!