Physics307L:Schedule/Week 10 agenda: Difference between revisions
From OpenWetWare
Jump to navigationJump to search
No edit summary |
No edit summary |
||
Line 5: | Line 5: | ||
==Pushing rough draft due date back one week== | ==Pushing rough draft due date back one week== | ||
==Fitting a line (linear regression, least-squares fit for a line)== | ==(Topic already covered, need new topic) Fitting a line (linear regression, least-squares fit for a line)== | ||
===[[/Why linear fit|Why and when linear fit?]]=== | ===[[/Why linear fit|Why and when linear fit?]]=== | ||
===[[/Linear fit theory|Theoretical background]]=== | ===[[/Linear fit theory|Theoretical background]]=== |
Revision as of 20:54, 23 October 2008