Physics307L:Schedule/Week 10 agenda: Difference between revisions

From OpenWetWare
Jump to navigationJump to search
No edit summary
No edit summary
Line 2: Line 2:


==Talk about lab improvisation (Darrell)==
==Talk about lab improvisation (Darrell)==
==Pushing rough draft due date back one week==


==Fitting a line (linear regression, least-squares fit for a line)==
==Fitting a line (linear regression, least-squares fit for a line)==

Revision as of 20:53, 23 October 2008


Talk about lab improvisation (Darrell)

Pushing rough draft due date back one week

Fitting a line (linear regression, least-squares fit for a line)

Why and when linear fit?

Theoretical background

Practical examples (We did this last week)

Fitting y = mx + b versus x = m'y + b'

More sophisticated curve fitting...a must read!