Klapperich Lab:Notebook/Lab Meeting Notes/2010/04/29: Difference between revisions
Cmklapperich (talk | contribs) No edit summary |
|||
Line 72: | Line 72: | ||
'''‡ PATH Grant (Lead:Cathie, Team:Frank, Sean, Mark, Jake Trueb (ME))''' <br> | '''‡ PATH Grant (Lead:Cathie, Team:Frank, Sean, Mark, Jake Trueb (ME))''' <br> | ||
*.<br> | *.<br> | ||
* Frank: | * Frank: Final report submitted 4/23. Final presentation 4/30. Met with Sam Byrnes last Wednesday to start training. Soon to be compiling documents/organizing supplies for continuing work on project.<br> | ||
* Sean: Data for 700 nm and 150 nm analyzed and it shows that 700 is better overall, and is best in the 60 - 80 SPE range. Final report almost complete and due tomorrow (4/23). I will get stuff together and leave my notebook for future research as well. <br> | * Sean: Data for 700 nm and 150 nm analyzed and it shows that 700 is better overall, and is best in the 60 - 80 SPE range. Final report almost complete and due tomorrow (4/23). I will get stuff together and leave my notebook for future research as well. <br> | ||
* Mark: as of 4/15/10 up to 30% recovery from 10 ng input sample with water elution. Also up to 13% recovery with 100ng/straw. 1-week trial completed as of 3/24. Results peak at 20% (-70C) and decrease with temperature. 2-month and 1-month trials complete, resulting in further degradation than in the 1-week trial. 4- and 6-month trials still in storage. Final Report draft submitted, due tomorrow. Presentation next Friday 4/30. Lab notebook will be updated and ready for future PATH SNAP workers.<br> | * Mark: as of 4/15/10 up to 30% recovery from 10 ng input sample with water elution. Also up to 13% recovery with 100ng/straw. 1-week trial completed as of 3/24. Results peak at 20% (-70C) and decrease with temperature. 2-month and 1-month trials complete, resulting in further degradation than in the 1-week trial. 4- and 6-month trials still in storage. Final Report draft submitted, due tomorrow. Presentation next Friday 4/30. Lab notebook will be updated and ready for future PATH SNAP workers.<br> |
Revision as of 08:26, 29 April 2010
Project name | <html><img src="/images/9/94/Report.png" border="0" /></html> Main project page <html><img src="/images/c/c3/Resultset_previous.png" border="0" /></html>Previous entry<html> </html>Next entry<html><img src="/images/5/5c/Resultset_next.png" border="0" /></html> |
29 April 2010 Lab Meeting
‡ Announcements
‡ Flu R01:Integration
† HDA (Lead:Sonali)
|