Klapperich Lab:Notebook/Lab Meeting Notes/2010/04/15: Difference between revisions
Sean Moser (talk | contribs) No edit summary |
Cmklapperich (talk | contribs) No edit summary |
||
(4 intermediate revisions by 4 users not shown) | |||
Line 15: | Line 15: | ||
'''‡ Flu R01:Integration''' <br> | '''‡ Flu R01:Integration''' <br> | ||
* meetings every other M 1-3pm. 705. <br> | * meetings every other M 1-3pm. 705. <br> | ||
** SEQUENCING WORK<br> | |||
* for PCR just do more reactions, pool and etoh precipitate. <br> | |||
** For HDA, we need to explore cloning. <br> | |||
† HDA (Lead: Jaephil, Team:Sonali)<br> | † HDA (Lead: Jaephil, Team:Sonali)<br> | ||
* IBC Approval or 720 to work with real C.diff samples. <br> | |||
* Patient Samples - dilution experiments (MM/SH) <br> | * Patient Samples - dilution experiments (MM/SH) <br> | ||
* Start planning R01 for Submission on ''' | * Start planning R01 for Submission on '''10/5/10.''' MM, CMK. <br> | ||
* HDA mix in dried form - Expecting it from BH -- ON HOLD. <br> | * HDA mix in dried form - Expecting it from BH -- ON HOLD. <br> | ||
* warm start here <br> | * warm start here (Give some to Lisa)<br> | ||
* QQ preliminary chip work <br> | * QQ preliminary chip work <br> | ||
* Sequence all output <br> | * Sequence all output <br> | ||
Line 26: | Line 32: | ||
<br> | <br> | ||
† Sample Concentration (Lead: Jane, Team: Jaephil) <br> | † Sample Concentration (Lead: Jane, Team: Jaephil) <br> | ||
* Straight channel adhesion test PCR result expected. | * Straight channel adhesion test PCR result expected. From 4/6 result, PDMS 4mm wide channel doesn't show decrease in output RNA over time <br> | ||
* Straight 1mm and 4mm PDMS-Teflon channel adhesion test pending PCR result. <br> | |||
* Try collection vs dilutions, collection vs time, need binding constant to quantify results. <br> | * Try collection vs dilutions, collection vs time, need binding constant to quantify results. <br> | ||
* Samples expected from Fauchet group. Contact today. ??? - CMK will check again. <br> | |||
* Samples expected from Fauchet group. Contact today. <br> | |||
<br> | <br> | ||
† SPE Column Optimization for DNA/RNA. (Lead: Sonali, Team: Hussam, Jessie, Brendan) <br> | † SPE Column Optimization for DNA/RNA. (Lead: Sonali, Team: Hussam, Jessie, Brendan) <br> | ||
Line 35: | Line 41: | ||
* http://patft.uspto.gov/netacgi/nph-Parser?Sect2=PTO1&Sect2=HITOFF&p=1&u=%2Fnetahtml%2FPTO%2Fsearch-bool.html&r=1&f=G&l=50&d=PALL&RefSrch=yes&Query=PN%2F5155018 <br> | * http://patft.uspto.gov/netacgi/nph-Parser?Sect2=PTO1&Sect2=HITOFF&p=1&u=%2Fnetahtml%2FPTO%2Fsearch-bool.html&r=1&f=G&l=50&d=PALL&RefSrch=yes&Query=PN%2F5155018 <br> | ||
* ( | * (Almost done) Jessie will run chips with serial virus dilutions from 1:1 to 1:1,000,000 to re-do previous dilution experimnent with WHO SYBR green assay on chip.<br> | ||
* | * <br> | ||
<br> | <br> | ||
† Integrated chip for flu(SPE+RT+PCR) (Lead: Qingqing) <br> | † Integrated chip for flu(SPE+RT+PCR) (Lead: Qingqing) <br> | ||
Line 67: | Line 71: | ||
<br> | <br> | ||
'''‡ PATH Grant (Lead:Cathie, Team:Frank, Sean, Mark, Jake Trueb (ME))''' <br> | '''‡ PATH Grant (Lead:Cathie, Team:Frank, Sean, Mark, Jake Trueb (ME))''' <br> | ||
* | *.<br> | ||
* Frank: Two- and three-week storage experiments completed. Four-week to be done next Wed. Longer-term (2, 3, 4-month) in storage. +/- carrier RNA not yet completed. Currently writing up final report.<br> | * Frank: Two- and three-week storage experiments completed. Four-week to be done next Wed. Longer-term (2, 3, 4-month) in storage. +/- carrier RNA not yet completed. Currently writing up final report.<br> | ||
* Sean: First set of data is in (for the 700 nm silica straws). Today (4/15) I will finish the straws for the 150 nm silica and the SPE batters for the 14 nm silica. Tomorrow I plan on running and PCR'ing samples for the 150 nm silica straws as well as making the straws for the 14 nm silica. On Saturday I will run and PCR samples for the last set of straws. <br> | * Sean: First set of data is in (for the 700 nm silica straws). Today (4/15) I will finish the straws for the 150 nm silica and the SPE batters for the 14 nm silica. Tomorrow I plan on running and PCR'ing samples for the 150 nm silica straws as well as making the straws for the 14 nm silica. On Saturday I will run and PCR samples for the last set of straws. <br> | ||
* Mark: as of | * Mark: as of 4/15/10 up to 30% recovery from 10 ng input sample with water elution. Also up to 13% recovery with 100ng/straw. 1-week trial completed as of 3/24. Results peak at 20% (-70C) and decrease with temperature. 2-month and 1-month trials complete, resulting in further degradation than in the 1-week trial. 4- and 6-month trials still in storage.<br> | ||
<br> | <br> | ||
'''‡ IIH Senior Project.'''<br> | '''‡ IIH Senior Project.'''<br> | ||
* | * ELISA done, Talking to Phil Allen about proper imaging | ||
* Writing report | |||
* | |||
<!-- ##### DO NOT edit below this line unless you know what you are doing. ##### --> | <!-- ##### DO NOT edit below this line unless you know what you are doing. ##### --> |
Revision as of 12:27, 15 April 2010
Project name | <html><img src="/images/9/94/Report.png" border="0" /></html> Main project page <html><img src="/images/c/c3/Resultset_previous.png" border="0" /></html>Previous entry<html> </html>Next entry<html><img src="/images/5/5c/Resultset_next.png" border="0" /></html> |
15 April 2010 Lab MeetingJake Presentation. ‡ Announcements ‡ Flu R01:Integration
† HDA (Lead: Jaephil, Team:Sonali)
|