Klapperich Lab:Notebook/Lab Meeting Notes/2010/01/21: Difference between revisions
Line 76: | Line 76: | ||
'''‡ PATH Grant (Lead:Cathie, Team:Frank, Sean, Mark, Jake Trueb (ME))''' <br> | '''‡ PATH Grant (Lead:Cathie, Team:Frank, Sean, Mark, Jake Trueb (ME))''' <br> | ||
* Submitted Gantt Document to PATH 11/25. <br> | * Submitted Gantt Document to PATH 11/25. <br> | ||
* Frank: | * Frank: 1-week in-tube stabilization experiment successful. Met with Sonali to learn hood cleaning and verify straw extraction protocol. Doing extractions for 1-week storage today (21 Jan).<br> | ||
* Sean: I have ordered the silica I need to start testing NA yields with different concentrations of different sizes of silica microspheres. I will begin this as soon as I can get to the lab when I return this week (today being 1/11). I still need to be shown quickly how to run samples. In addition, I will not be able to make the weekly lab meetings due to a class conflict, unless the class does not meet in any given week or gets out before 4. I apologize for this. I will post all weekly updates in detail here because I won't be at the meetings. <br> | * Sean: I have ordered the silica I need to start testing NA yields with different concentrations of different sizes of silica microspheres. I will begin this as soon as I can get to the lab when I return this week (today being 1/11). I still need to be shown quickly how to run samples. In addition, I will not be able to make the weekly lab meetings due to a class conflict, unless the class does not meet in any given week or gets out before 4. I apologize for this. I will post all weekly updates in detail here because I won't be at the meetings. <br> | ||
* Mark to begin initial DNA testing with shorter time periods (1,3 days, etc.) to be completed this(?) week. New straw fixture to be set up in old fume hood. Fume hood to be sterilized for use only with straw machine. <br> | * Mark to begin initial DNA testing with shorter time periods (1,3 days, etc.) to be completed this(?) week. New straw fixture to be set up in old fume hood. Fume hood to be sterilized for use only with straw machine. <br> |
Revision as of 09:38, 21 January 2010
Project name | <html><img src="/images/9/94/Report.png" border="0" /></html> Main project page <html><img src="/images/c/c3/Resultset_previous.png" border="0" /></html>Previous entry<html> </html>Next entry<html><img src="/images/5/5c/Resultset_next.png" border="0" /></html> |
21 January 2010 Lab MeetingMincheol Presentation. ‡ Announcements
† HDA (Lead: Jaephil, Team:Sonali)
† SPE Column Optimization for DNA/RNA. (Lead: Sonali, Team: Hussam, Jessie, Brendan)
† PCR - CMI (Lead: Qingqing)
|