Klapperich Lab:Notebook/Lab Meeting Notes/2008/09/08: Difference between revisions

From OpenWetWare
Jump to navigationJump to search
No edit summary
Line 80: Line 80:


[http://openwetware.org/wiki/Image:Progress_9-1_to_9-7_.doc hussam's Update] <br>
[http://openwetware.org/wiki/Image:Progress_9-1_to_9-7_.doc hussam's Update] <br>
[http://openwetware.org/wiki/Image:Jane_Lab_Plans_Actions_Sept8_08.pdf Jane's Update] <br>


<!-- ##### DO NOT edit below this line unless you know what you are doing. ##### -->
<!-- ##### DO NOT edit below this line unless you know what you are doing. ##### -->

Revision as of 19:20, 7 September 2008

Project name <html><img src="/images/9/94/Report.png" border="0" /></html> Main project page
<html><img src="/images/c/c3/Resultset_previous.png" border="0" /></html>Previous entry<html>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</html>Next entry<html><img src="/images/5/5c/Resultset_next.png" border="0" /></html>

8 September 2008 Lab Meeting Agenda

† Announcements

  • Fall Group Meetings will be on Tuesdays from 12-2pm in room 705
  • Register for CIMIT conference if you want. Irene can reimburse.
  • Register for IMECE in Boston
  • Register for MRS Boston if you want to.

† Flu R01

  • Meeting still not set
  • Plaque assay?

† SEPSIS Project/Chip Bonding Issues

  • YES Check if Anlee can do backscatter electrons on new SEM

†RNA project

  • Stephanie met with Sonali, Cathie and Anirban to discuss experimental plan.
  • Sonali will teach Stephanie Jurkat Culture.

† COBRA

  • Mark finish control circuit (Temp, humidity, pressure) design and ordered parts
  • Evaporation fixture will be picked up during this week, and assembled after comeback
  • IBC for our lab revision submitted 9/4
  • Tests on chips with covers underway
  • Jane is investigating the multilayer design

† Valve Array

  • Waiting for fixture still from Melissa
  • Need complete assembly picture before 14th, forward it to Jaephil for whitepaper
  • Basic software in place


† Fraunhofer: LOAC

  • Still troubleshooting

† Biointerfaces group

  • Brett, Mincheol, Jaephil and Hussam had meeting and decided to try DRIE (by Brett) with SU-8 (by Mincheol) together
  • i-line(365nm)has diffraction limiting resolution about 2um at best
  • Mincheol will try the device as we have it
  • Hussam, Brett and MinCheol are going to make a protocol for this process
  • AZP 4620 from Clariant. Hussam will try this photoresist (positive)

† CIMIT Flu

  • Met with Sepsis Nurse Tuesday. Preliminary plan for IRB submission at Harvard in place. Target date 1/1/09

† PCR

  • QQ Model has 30 cycles. MinCheol will try the model. Need to upgrade the Star-CD program. Dan Kamalic has to do this.
  • Dan fixed Star-CD.
  • Waiting for new heaters to try again. Other brand was not good. Will use copper in the meantime for temp control.
  • PUMP problem. Speed control at low flow rates is not stable.
  • What are the specs on Wong's pump?
  • What are the specs on our pumps?
  • Can KDS calibrate or fix it?
  • We need at least one more pump that does multiple channels. Mincheol will check the specs?
  • What requirements does everyone have for their "IDEAL" pump.

† RCA

  • STILL Working on a test chip to examine mat'ls compatibility
  • 50 microliter test chip made/ may be and issue getting the stuff out. Especially after the wash.
  • Heiko, Sonali, and Jaephil write their own part in a whitepaper and forward it to Cathie by 14th.

† Senior project

  • New students will be recruited.
  • Megan works on micro membrane valve and pump development as sr project.

† F31: Cochlea

† Silica Optimization (Lambda):

  • Ongoing


hussam's Update
Jane's Update