IGEM:Imperial/2010/Strategy

From OpenWetWare
Revision as of 09:29, 17 August 2010 by Wolfgang Pernice (talk | contribs)
Jump to navigationJump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Strategy

Assembly strategy and Lab-work

Please refer to the overall assembly strategy for details.

Three Lab-teams are currently working in parallel to assemble parts which will be needed for down-stream steps, as soon as the synthesized sequences arrive.

LINKS to lab teams.

LINKS to shedule history (?)

Wolfs checklist

Additional primers - work in progress
  • Urgent primers have been ordered on Monday 16th.
  • 14 other primers will be required. Design is in progress (pic of word table)!
  • Experimental design for XylE e.coli testing!
  • Functional testing strategies have been developed and have been indicated in the overall assembly strategy diagram. Need to be written up properly!
  • XylE and TEV will not be tagged. In order to be able to analyse their activity, we will compare substrate-turnover rates.
  • Strategies for testing of expression etc have to be developed and structured.
  • List of parts for submission has to be assembled.
  • Gant chart!
  • How much synthetic AIP will be required to trigger our test system? (Modellers)
  • ComE promoter system - recap on mode of function.