IGEM:IMPERIAL/2006/LabCalendar/2006-8-20

From OpenWetWare
Revision as of 12:55, 21 August 2006 by Farah (talk | contribs) (→‎J37016 Testing)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search


T9002 Testing

Results to be processed on Monday.

J37016 Testing

Plate became cross-contamination in shaker. Data to be processed on Monday.

S01656 Testing

  • Followed Protocol
  • see Protocol page
  • OD Values:
    • 1st measurement +IPTG = 1.405
    • 1st measurement -IPTG = 1.800

Miniprep

  • J37031
  • J37032

For tomorrow

  • Maxiprep J37015RS (in shaker)