Biomod/2011/Caltech/DeoxyriboNucleicAwesome/Results
From OpenWetWare
Friday, April 26, 2024
|
ResultsWhile the overall project is the sorting of cargos on origami, we expected verification of all of the mechanisms would take longer than one summer. Therefore, this summer was spent verifying two aspects of the project:
Verification of Overall Mechanisms in SolutionGel Verification
SPEX VerificationVerification of Random Walking Mechanism on OrigamiSPEX VerificationAFM Verification |